
The exterior woodwork on the Marconi Operations Building is limited to the lower edge of the Piazza roof. The woodwork is missing. (Photo Nos. 162 - 164).
Photos: 162, 163, and 164.
Proposed Work
During Phase III replace missing woodwork, prime and paint.
Photo 162
Photo 163
Photo 164
Updated January 27, 2004
Page created July 4, 2002