The exterior masonry is structurally sound. The area needing work is the soffet beneath the roof. The wire mesh and angle iron supports have failed causing the stucco soffet covering to fall (Photo Nos. 161-164). Other masonry repair will be needed where the collapsed cement block boiler room addition was attached to main building. To secure the building from determined vandals, plywood was secured over all openings with nail guns. The securing of plywood with nail guns will require repair to broken brick and mortar joints.
Photos: 161, 162, 163, and 164.
Proposed Work
During Phase I remove masonry debris from soffet stucco and remove remains
of boiler room. During Phase III repair damage to masonry from boiler
room construction. Replace wire mesh and cover with new cement stucco.
Repair damage from nail gun fastners.