
The exterior woodwork on the Marconi Hotel is limited to the eaves and soffit areas (Photo Nos. 18 and 19). The dark brown exterior paint is pealing in strips.
Photos: 18 and 19.
Proposed Work
Prepare surface and repaint during Phase I; also remove vines and other
unwanted plant growth. Also examine condition of exterior wood for
any signs of deterioration. Repair or replace as appropriate with
exact reproductions of original exterior woodwork.
Photo 18
Photo 19
Updated January 27, 2004
Page created July 4, 2002