The 1985 modifications included new heat and the addition of air conditioning. The 2001 removal of adjacent transformer vault has left the structure without electric. There is also no sewer to connect restroom to.
Photo: 193.
Proposed work
The BRAC office is currently developing construction plans to electrify
all buildings with the historic district as part of the electrical substation
replacement. During Phase I evaluate the condition of heat and air
conditioning repair as necessary. During Phase V renovations integrate
air conditioning ductwork into walls and attic spaces as original WWII
interior is recreated.