APPLICATION FOR OBTAINING REAL PROPERTY FOR HISTORIC MONUMENT PURPOSES    (APPROVED - April 2002)
InfoAge HomepageBack to the InfoAge HomepageBackBack to the Historic Monument Application Index

8.11 Heating Oil Plant (Building 9012)

Architectural Feature: Heating Plant for 9010 & 9011
 Date: 1942

This masonry structure is rectangular (Photo No. 58) and houses two boilers to heat the 'H' building complex 9010/9011.  The building has a gable roof with two sheet metal ventilators.  Windows are steel frames.  A wide rectangular brick chimney extends from the east end of the structure.  A single metal door allows access to interior stairs leading to the basement level.  The 1982 installed boilers are at basement level.  The boiler pipes and auxiliary equipment take up two stories (Photo No. 59).

Photos: 58 and 59.

Proposed work

During Phase I, service oil/gas boilers and evaluate the possibility and feasibility of eliminating the central oil fired boilers.  The central system would be replaced by individual systems in each section of the 'H' complex.  The conversion would take place when funds allow.  The heating plants could then be used for tall exhibits or other special exhibits.
Photo 58
Photo 59
Updated January 27, 2004    Page created July 27, 2002


InfoAge HomepageBack to the InfoAge HomepageBackBack to the Historic Monument Application Index